
WESTPORT–On one key point in the plan to replace the William F. Cribari Memorial Bridge, Westport and the state remain inches apart. The Connecticut Department of Transportation (CTDOT) said this week that it would not lower the clearance of a new bridge below 13 feet, 10 inches, while many in town want it brought down low enough to be a physical barrier for tractor trailer trucks, which can reach 13 feet, 6 inches.
Bart Sweeney, CTDOT assistant chief engineer, held the line on the higher clearance in a Tuesday night meeting of the recently formed Cribari Bridge Committee in Town Hall, after First Selectman Kevin Christie announced the decision.
Christie had learned the state’s position the night before in a meeting with CTDOT officials, state Representative Dominique Johnson and Representative-elect Lee Goldstein, he said.
“I just want to be clear and reiterate: None of us want 18 wheelers rolling through our residential neighborhoods here in town,” Christie said in the committee meeting in Town Hall. He added, “now that we know where DOT stands on height, we can focus on other areas.”
Others were not ready to accept the state’s decision as final.
“What occurred last night was not acceptable to the community; not in the process and not in the result,” said Representative Town Meeting (RTM) member Matthew Mandell, D1. “The first selectman created a committee to advise him on what should be done. Instead, he has a meeting without going in with any information from them. He simply accepted what the DOT had to say instead of reaching out to the committee and seeing what he should do in terms of defending our town.”
Wednesday morning, the first selectman said in an email that he was reporting the state’s position, not advocating for it.
“The determination on bridge clearance was DOT’s,” he said, noting that he has been meeting with the agency since soon after taking office. “When DOT made clear on Monday that it would not further reduce the proposed clearance, I felt it was important for the committee and the community to hear that directly from DOT as soon as possible, which is why I invited DOT to Tuesday’s meeting.”
Yesterday, Christie announced that he had asked Public Works Director Larry Roberts to propose “no through trucks” designations on Bridge Street and other roads in the area to divert truck traffic coming off I-95 to Route 33, Route 136 and the Sherwood Island Connector.
The existing span carrying Route 136 – Bridge Street – over the Saugatuck River, has a clearance of 12 feet, 7 inches on the eastbound side because of a damaged truss member. Residents fear that a modernized bridge would become a detour for 18-wheelers dodging traffic on Interstate 95.
During the three years that construction of a new bridge is expected to take, motorists would use a temporary bridge, which, Sweeney said, would accommodate all traffic.
Barring trucks from the temporary bridge was one of several requests made by RTM member Gail Coykendall, D1, conveying the position of four community groups – Save Westport Now, the Greens Farms Association, the Westport Preservation Alliance and the Westport Alliance for Saugatuck.
The groups also called for an adaptive rehabilitation of the existing 1884 bridge to be considered the preferred alternative. Other measures they requested were to lower the clearance to 13 feet, 4 inches – posted as 12 feet, 7 inches – with high-tech warning systems on nearby streets to alert trucks before they reach the bridge. They want the state to expand the area it is reviewing for impacts to include the entire Bridge Street Historic District, which includes the bridge, as well as the five-mile corridor along Bridge Street and Greens Farms Road.
They also want the traffic calming measures in the area, and to scrap the state’s plans to “soften” corners for smoother turns onto the bridge, preferring the 90-degree angles to safeguard pedestrians.
The state will next hold a meeting 7 p.m. Dec. 14 in Town Hall to discuss mitigations to the impact on historic properties, not other matters. The point was reinforced in an email Wednesday from Mandy Ranslow, the CTDOT cultural resources supervisor, who said the state will continue to work with the town on other matters, such as traffic and safety, separate from the meeting.
The CTDOT is accepting comments and mitigation to historic properties until Dec. 18.


Recent Comments